It consists of Administration and Production Buildings for Electrical Equipment Factory Project.
We participate from the elaboration of lay-out of all the manufacturing functions until the design of the buildings.
The production characteristics demanded some areas with greater heights, and also the prediction of possible internal alteration of these areas and the consequent need of greater height in other areas of the plant.
We then adopted a metal structure, which allowed easier alteration of the interior heights of the building, when necessary.